Demolition and excavation of pipes at the beginning of the west dock.

20/12/2015

The works consist of carrying out an underground gallery with the shape of a drawer made of concrete, in which there will be fuel pipes which nowadays are at the back wall of the wet dike. This will colclude with the demolition of 405 m. of the back Wall which i son the first line […]

Adaptation non- drinking water network and conditioning of the service road of Dato dock.

21/10/2010

This action has developed in Cañonero Dato avenue and included the neccesary elements to establish a watering network with non-drinking water, to replace the mains of public lighting, to remove obsolete elements from central reservations taking advantage of the reusable components and setting up new lineal gardens with ornaments, and to renew layers of the […]

Demolition and excavation of pipes at the beginning of the west dock.

01/02/2010

The works consist of carrying out an underground gallery with the shape of a drawer made of concrete, in which there will be fuel pipes which nowadays are at the back wall of the wet dike. This will colclude with the demolition of 405 m. of the back Wall which i son the first line […]

Air conditioning and new centralized of meters of the maritime station.

01/02/2010

The works are focused on installing a new air conditioning system in order to improve the energy efficiency, as well as the adaptation to the rules of centralized and electric board located in the Maritime Station. This investment was awarded by the Presidential Resolution with date on 25th October 2010 to Corsan-Corviam Construcción, S.A company. […]

Reinforcement and improvement of west and east docks.

01/02/2010

These works have consisted of the parcial repair of the damaged infrastructures, which correspond to: 1) Longitudinal cracks in the adjacent road of the West Dock; 2) Settlement of the platforms located on the third alignment of the dock; 3) Damages on the fence between the wall and replacement of pebbles of West and East. […]

Reinforcement and improvement of the marina.

01/02/2010

The aim of this work consists of a reconstruction of the main breakwater of the Port dock through 3 Tn. Breakwaters, adapting the existing slope ( 1H:1V) to the slope 1,5H:1V, until the end +3,20 above B.M.V.E.. Moreover, the construction of a wall in which the seawall will be 180 metres long from the beginning […]

Setting up the attention point for land transport (patt)

01/02/2010

One floor building with 1.176 square metres, aiming to accomodate facilities for inspection, sanitary control, and Port services of fiscal intervention linked to the Tax Agency. The overall cost of the transaction increased to 1.200.000,00 euros. The overall expense on 31st of December, 2009 was 1.200.000,00 euros. This work started on 22nd of July, 2008 […]

Enabling of the esplanade enlargement of the Port of Ceuta. Starting phase.

01/02/2010

“The fitting out works of the esplanade of the enlargement of the Port of Ceuta. Starting phase”, were awarded on 17th November 2009. They began in March 2010, they finished in July 2011 and they were received on 3rd May 2012. These works consist of remodelling the new port esplanade so as to be used […]

Reinforcement and improvement of the marina.

31/12/2009

The aim of this work consists of a reconstruction of the main breakwater of the Port dock through 3 Tn. Breakwaters, adapting the existing slope ( 1H:1V) to the slope 1,5H:1V, until the end +3,20 above B.M.V.E.. Moreover, the construction of a wall in which the seawall will be 180 metres long from the beginning […]

Enabling of the esplanade expansion of the Port of Ceuta.

17/11/2009

The works of the financing of the esplanade of the Expansion of the port of Ceuta. Initial Phase was awarded on November 17, 2009 and its beginning was carried out in March 2011 and finished in July 2011, although budgetingly it contemplates an annual payment for 2012. They consist of the conditioning of the new […]