Port Authority

Setting up the attention point for land transport (patt)

One floor building with 1.176 square metres, aiming to accomodate facilities for inspection, sanitary control, and Port services of fiscal intervention linked to the Tax Agency.

The overall cost of the transaction increased to 1.200.000,00 euros.

The overall expense on 31st of December, 2009 was 1.200.000,00 euros.

This work started on 22nd of July, 2008 and it concluded 22nd of December, 2009, lasting 17 months.

The operating indicator in the work is the square metre, as it is a built surface. The overall operative indicator was 1.176 square metres.