Paving of the 3rd alignment of the Poniente dock.

The works consisted in the complete resurfacing of the surface of the 3rd alignment of the Poniente dock, since this area had a very deteriorated appearance due to subsidence, fractures and absence, in some cases of the pavement, in addition to stains and dirt adhering to the ground due to the usual spills in the supply of oil products.

Work completed in May 1998.

The total cost of the operation amounted to € 234,451.70