AVISO LEGAL

El Portal Web tiene carácter divulgativo y orientativo, y pretende poner a disposición de cualquier persona interesada toda la información relacionada con la Autoridad Portuaria de Ceuta.

No obstante, es preciso puntualizar lo siguiente:

- Los textos, normativa y en general cualquier información contenida en las páginas de este Portal tienen carácter meramente informativo, por lo que sugerimos compruebe la vigencia y exactitud de los datos en las fuentes administrativas oficiales correspondientes.

- La información que se ofrece podría no ser exhaustiva, exacta o actualizada.

- Se facilitan vínculos a páginas externas sobre las que el Autoridad Portuaria de Ceuta no tiene control alguno, y respecto de las cuales declina toda responsabilidad.


Autoridad Portuaria de Ceuta

FEDER 96-00

Demolition and creating of subterranean piping at the Stara of the western dike.-

The works consist of the execution of the subterranean corridor of reinforced concrete, in which the combustible tubes will be located, which presently run by the dikes western entrenchment, causing the demolition of the 405 metres of exixting entrenchment in the first part of the mentioned dike:

  • The total cost of the operation has increased to the amount of 2.018.611,96 €
  • The total amount spent on the 31st of December 2009 was 2.018.611,96 €

The works started on the 20th of December 2005, and ended on the 16th of February 2008, lasting a duration of 26 months.

The assigned operating indicators of the works are: linear metres of installed combustible tubing, and linear metres of installed water tubing which, at the time of finalisation were 4,111 metres and 415 metres respectively; which means a total of 4,526 metres of installed tubing

 

 

 

 

 

 

 

Strenghtening and improvement of the westerly and easterly dikes.-

The work consisted in the partial reparation of the damaged infrastructure, which basically involve: 1) Longitudinal cracks which appeared in the road alongside the westerly dike; 2) Settlements on the platform located on the third line-up of the mentioned dike; 3) Damage to the existing closing fence on the entrenchment and the replacement of the coronation of the westerly and easterly mouths.

  • The total cost of the operation has increased to the amount of 2.817.654,99 €
  • The total amount spent on the 31st of December 2009 was 2.817.654,99 €

He works started on the 29th of September 2006 and ended on the 29th of November 2007, lasting a duration of 14 months.

The assigned operating indicator of the works is: square metres of repaired pavement. At the end of the works the total amount of repainted metres squared was 2,470 m2.


 

Strengthening and improvement of the sports dock.-

The contracted purpose of these works consist of the reconstruction of the main breakwater cloak of the dikes of the sports dock using breakwaters of 3 Tn., adapting the existing slope (1H:1V) to the stope of 1.5H:1V, to the elevation of +3.20 on the B.M.V.E. Likewise, the predicted construction of a wave wall on the main protection cloak, which will be 180 metres long from the start of the dike to its mouth. Said works also include reparation of the necessary jetty and fingers units which remained broken after the storm, and the repositioning of the damaged plumbing and electricity network.

  • The total cost of the operation has increased to the amount of 745.895,31 €
  • The total amount spent on the 31st of December 2009 was 745.895,31 €

The works began on the 22nd of July 2008 and finished on the 22nd o December, lasting a duration of 17 months.

The assigned indicators for this project were: tons of breakwater used, and linear metres of jetty repaired. At the end of these works, the value of said indicators was 9.123 Tn of breakwater, and 257 metres of jetty.